top of page

Group 2 & 3 Pressure Reducing Station Replacement

Valley CM provided full Construction Management and Inspection services for the installation of twelve (12) EFI prefabricated pressure reducing stations in the County of San Diego and City of Solana Beach.  The work also included in the installation of over 3,000 LF of new 8-inch diameter water main.  Demolition of the 50-year-old + existing pressure reducing stations was required and had to be coordinated with District operations to minimize disruptions to the District’s customers and distribution system.

bottom of page