Tertiary Filtration & Headworks Project
This project includes the installation of a dual-media granular filtration system, 4MGD pump station, reinforced concrete structures including grating, air blowers for filtration backwash, backwash supply pump station, new chemical systems, various mechanical piping, new electrical and instrumentation equipment and software. The headworks portion of the project included the installation of a 5MGD sewer bypass, polyurethane lining of the existing influent channel, new sluice gate, various mechanical piping, new electrical, instrumentation equipment and software